Machine settings for initial commissioning by the
service engineer
8.1
Commissioning
In order to avoid damage to the installation and the injury and death of persons when
commissioning the installation, the following points must be observed without fail:
Any necessary initial tests to parts supplied by sub-suppliers, such as heat pumps or
other equipment, must be carried out. More detailed information, if required, can be found
in the relevant Instructions for Use.
 The installation may only be commissioned by suitably qualified persons observing
the safety instructions.
 Before initial startup, check that any tools and parts not belonging to the installation
have been removed.
 Check whether any escaping liquid is removed.
 Activate all the safety systems and door switches before commissioning.
 Check that all screw connections are tight.
 Please also read the chapter on "General safety instructions ".
Commissioning and instructions will be provided by technicians specially trained by
Meiko. The operator may only use the installation after training has been provided.
8.2
Chemical product settings
The correct settings for the quantity of detergent and rinse agent depend on the product
used. The relevant chemical supplier can install the correct setting.
8.3
Works to be carried out before initial commissioning
All the points in this section must be observed before initial commissioning!
Water-carrying pipes
All pipes must be thoroughly flushed out. The heating system must not be switched on
when this is done (remove the fuses) in order to prevent the heating elements from
operating when the system is dry. All dirt collectors must be cleaned afterwards.
Steam pipes
All pipes must be thoroughly flushed out. When doing so, all control valves must be fully
open and all condensate traps removed. All dirt collectors must be cleaned afterwards.
Connection to the electricity supply
Tighten all electrical terminals in the switch cabinet; check that electrical
plugs/jacks are firmly in position.
All motors must be check for the correct direction of rotation.
Carry out a visual check on all electrical equipment (e.g. switches, cables,
housings, covers).
Carry out functional tests on all electrical switches.