Operating instructions EcoStar 545 D-M
ATTENTION!
Datei:1_EcoStar545D-M_9662798_Betriebsanleitung_EN_2009-05.doc
MEIKO Maschinenbau GmbH & Co. KG, Postfach 2040, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121
6.9
Instructions for the disposal of the packaging material
• The four-sided wooden frame consists of untreated, raw wood.
Special country-specific import regulations may also stipulate the use of wood which
has been treated against pests.
• The plastic sheeting (PE sheeting) may be recycled.
• The cardboard packaging material used to protect the edges can also be recycled.
• The steel tensioning strap made of strip steel may be recycled with the steel scrap.
• The plastic tensioning strap of plastic (PP) can be recycled.
7
Settings for initial commissioning by the service engi-
neer
7.1
Commissioning
In order to avoid damage to the installation and the injury and death of persons when
commissioning the installation, the following points must be observed without fail:
Any necessary initial tests to parts supplied by sub-suppliers must be carried out. More
detailed information, if required, can be found in the relevant Instructions for Use.
•
The installation may only be commissioned by suitably qualified persons ob-
serving the safety instructions.
•
Before initial startup, check that any tools and parts not belonging to the instal-
lation have been removed.
•
Check whether any escaping liquid is removed.
•
Activate all the safety systems and hood switch before commissioning.
•
Check that all screw connections are tight.
•
Please also read the chapter on "General safety instructions ".
•
Commissioning and instructions will be provided by technicians specially trained
by Meiko. The operator may only use the installation after training has been
provided.
8
Washing with dish-washer
The appliance must not be used without a thorough knowledge of the "Operating In-
structions". Incorrect operation could result in injuries to personnel or damage to the
appliance.
8.1
Operating panel
Program is running
appliance is switched on
Temperature display tank / boiler,
Fault display
Information display
Code display
Illustration 1; Operating panel
Update:2009-12-18 MRL
W e reserve the right to change execution and construction!
Program is running
Program start key
9662798
"Off" key
13/42