Machine Settings For Initial Commissioning By The Service Engineer; Commissioning; Works To Be Carried Out Before Commissioning; Setting The Temperature Of The Wash Tank, Clean Water Rinsing, Drying - Meiko K-tronic Operating Instructions Manual

Dishwashing machine
Hide thumbs Also See for K-tronic:
Table of Contents

Advertisement

Operating Instructions – Dishwashing machine model K-tronic
ATTENTION
Datei:2K_9545483_Betriebsanleitung_EN_1992-01-01.doc
Änderungen in Ausführung und Konstruktion vorbehalten. / W e reserve the right to change execution and construction. / Nous nous reservons le droit de changer l´éxécution et la construction.
MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121
5
Machine settings for initial commissioning by the
service engineer.

Commissioning

5.1
In order to avoid damage to the installation and the injury and death of persons when
commissioning the installation, the following points must be observed without fail:
• The installation may only be commissioned by suitably qualified persons observing the
safety instructions.
• Before initial startup, check that any tools and parts not belonging to the installation
have been removed.
• Activate all the safety systems and magnetic door closers before commissioning.
• Please also read the chapter on "General safety instructions".
The technicians installing the installation will provide training and carry out
commissioning. The operator may only use the installation after training has been
provided.

Works to be carried out before commissioning

5.2
All the points in this section must be observed thoroughly before initial commissioning.
− water-carrying pipes
All pipes must be thoroughly flushed out. The heating system must not be switched on
when this is done (remove the fuses) in order to prevent the heating elements from
operating when the system is dry. All dirt collectors must be cleaned afterwards.
− Steam pipes
The servo-valves must be checked to ensure that they have been correctly evacuated
or emptied of water (only at the relevant pressure). (When the valves are turned off,
water must be discharged through the connection "R"). All bolted and flanged
connections must be tightened after the first time the appliance is heated.
− Electrical connection
Check that electrical terminals in the switch cabinet are firmly in position, tighten if
necessary; check that electrical plugs/jacks and especially electronic parts are firmly in
position.
− Internal regions of the machine
Ensure that there are no foreign bodies inside the machine (e.g. cleaning rags, loose
bolts/washers/nuts, tools, packaging materials etc.).
Important !!!
Ensure that no danger of jamming or entangling occurs where
moving parts pass close to fixed parts
cradles, water deflectors and others).
5.3 Setting the temperature of the wash tank, clean water rinsing,
drying
5.3.1 The wash tank temperature (setting) should be about 55 – 60°C.
A clear distinction must be made here between
Update: 2012-02-14, S. 16
(e.g. rails, transport
9545483
17/58

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents