Area Of Installation; Connection Of Drainage Pipes - Kessel aqualift f Installation, Operating And Maintenance Instructions

Wastewater with and without sewage for free-standing installation in frost protected rooms
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 37
The following parts are included in the scope of supply (see
section 2.2):
- Collecting tank with all components mounted
- Electric Control Unit (plug-in-ready)
- Accessories
The electric switch unit must be stored in a frost free and
IMPORTANT:
weather protected area prior to installation.
If the control unit is to be connected at a later date, it
should be properly stored as stated above.
Caution
Danger due to heavy weights. The lifting station weig-
hs approx. 45 kg (single system). The parts may only be
lifted and/or assembled using suitable equipment and
exercising appropriate caution. If the system
is dropped, this can lead to irreparable damage to system
parts (e.g. pump) or the entire system. Such damage is not
covered by the warranty.
The KESSEL lifting station Aqualift
INSTALLATION SITE:
for free-standing set-up in frost-protected rooms. The
area of installation should be protected against flooding.
A submergence of the lifting station for more than 24
hours can cause the system to stop operating and can
lead to irreparable damage. The included control unit
should be mounted in a flood protected, dry and frost
proof room.

4.1 Area of installation

In order to prevent improper installation, service or repair of
the lifting staition, it must always
be installed in such a way that there is sufficient access to all
areas of the lifting station and replacement of all components
is possible. DIN 1986 requires at least 60 cm of access
space on all sides of the system.
The system must be set up in a appropriate area of a room,
aligned horizontally and placed on a sound-insulating matt
(available as an accessory from KESSEL).
The lifting station must be properly secured to the floor with
the included. This will prevent unwanted movement / twisting
of the system during start-ups and operation.
4. Installation and assembly
F has been designed
®
45
Lifting station body
Vibration matt
(optional)
Floor

4.2 Connection of drainage pipes

All drainage pipes connected to the lifting station must be in-
stalled so that they can completely drain into the lifting stati-
on (no standing water in the drainage pipes). All pipe connec-
tions must be flexible and sound insulated.
There are two types of connections possible:
tank (for connection of main inlet pipe, ventilation and
I.
Use of existing integrated connecting spigots on the
manual diaphragm emergency pump according to
Fig.A) Capped spigots should be cut off as shown on
the diagram (at by cutting off the "front cap" as shown
in Fig. C.)
Ventialtion DN 70 (OD
Emergency pump conenction
DN 32 (OD
=40mm)
a
Fig. A: Single pump system
The socket side of a standard drainage pipe can now be
fitted over the cut off spigot (lubricated appropriately).
(see Fig. C)
Mounting bracket
=75mm)
a
Inlet
Connection
DN 100
(OD
m)
=110m
a

Advertisement

Table of Contents
loading

Table of Contents