Ver. 1.2
(22) Shake the Developer Bottle thoroughly (approx. 30
seconds).
(23) Pour the appropriate developer evenly into the
developer unit. Make sure to empty the bottle.
(24) Close the Developer Cover.
Note:
When reinstalling the Developer Cover, ensure that 2
Magnet Roller Sheets are outside as illustrated.
<Removing the Old OPC Drum>
(25) Remove the OPC Drum Shaft Holder Assembly.
(26) Lift the OPC Drum, holding the right side where the
OPC Drum Shaft Holder Assembly was installed.
Note:
Do not touch the surface of the OPC Drum with bare
hands when removing or reinstalling it. Grease from
fingerprints will affect copy quality. When installing a
new OPC Drum, clean the Bias Charge Roller with a
soft dry cloth.
(27) Remove the Bias Charge Roller (725).
(28) Remove 2 Screws (20).
58
DP-8032/8025
2008