Panasonic DP-8032 Service Manual page 319

Digital imaging systems
Hide thumbs Also See for DP-8032:
Table of Contents

Advertisement

Ver. 1.2
(37) Connect the PTC-AC Harness 3 to the HT3 Harness.
(38) Insert the HT3 Harness and PTC-AC Harness 3 to 2
Harness Clamps.
(39) Route the HT3 Harness to the lower section of the
frame as illustrated.
(40) Mount the Heater onto the Heater Bracket.
(41) Remove the LSU Unit.
(Refer to 2.2.10. of the Service Manual)
(42) Connect the Heater Assembly to the PTC-AC
Harness 3.
(43) Install the Heater Assembly.
(44) Secure the Heater Assembly with 1 Screw
(XTB3+4FFJ).
(45) Install the Harness Clamp.
(46) Insert the PTC-AC Harness 3 to 2 Harness Clamps.
(47) Route the PTC-AC Harness 3 to the rear section of
the frame through the access hole as illustrated.
(48) Slide the 1st Paper Tray out.
(49) Install the Protection Sheet.
319
DP-8032/8025
2008

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dp-8025

Table of Contents