Installation Procedure; Pre-Installation Procedure; Preparing The Installation - Magiglo TRIBUTE PD-08-002 User, Installation & Servicing Instructions

Table of Contents

Advertisement

3.9.

Installation Procedure

Before commencing installation, ensure that the intended installation will comply
with details in General Information on Page 1.
Carefully unpack the contents of the carton and check them against the checklist given on the
previous page.
3.9.1.

Pre-Installation Procedure

Appliance
1. Unpack the appliance from its carton.
2. Remove the 14 glass frame retaining
nuts (see Figure 22) and lift off the glass
frame. Place in a safe place.
3. Apply the sealing tape around the rear
edge of the flange on the appliance.
4. Unpack the cables from the cable fixing
kit and feed the end into the holes in the
two tabs at the rear top of the appliance
(see Figure 23)
The appliance is now ready for installation.
3.9.2.

Preparing the Installation

General Notes
1. Attempt to keep the recess and any hole
sizes as close as possible to the
minimum dimensions. This will keep the
installation tidy without the need for
excessive sealing afterwards.
2. Ensure any damp course, electrical
wiring and any pipe work within the wall
is not going to be affected by the
installation.
3. Any gas pipe concealed in the wall, floor
or cavity must be continuous and
enclosed within a gas tight sleeve. (See
Page 18
Glass Frame
Securing Nuts
Figure 22
sealing
tape
Figure 23
current Gas Safety (Installation & Use)
Regulations:).
4. Ensure that the chosen position for the
appliance
will
requirements detailed in Section 3.5
5. Having
decided
installation type, e.g. recessed or surface
mount,
proceed
following section.
Cables
comply
with
the
the
appropriate
to
the
appropriate

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents