6A2-14 ENGINE MECHANICAL (H25 ENGINE)
7) Install EGR pipe (3) with new gaskets.
8) Connect EVAP canister purge valve hose (4) and heater
hose (5).
9) Connect PCV hose (6), breather hose (8) and water hose
(7).
10) Connect couplers of manifold absolute pressure (MAP) sen-
sor, EVAP canister purge valve (1) and EGR valve (2).
Fix wire harness with clamps.
11) Install clamp bracket (5) to intake collector.
12) Connect earth terminal (4) to intake collector.
13) Connect couplers of TP sensor (1), MAF sensor (2) and IAC
valve (3).
14) Connect brake booster hose (2) to intake manifold.
15) Connect injector wire (1) coupler.
16) Connect water hoses (3) to throttle body.
17) Connect accelerator cable (1) and A/T throttle cable (for A/T
vehicle) (2) to throttle body.
18) Install surge tank pipe (2) to intake manifold with new gas-
kets and intake air pipe (1) to throttle body.