Suzuki Engine 2002 GRAND VITARA SQ420 Service Manual page 321

Table of Contents

Advertisement

6A1-30 ENGINE MECHANICAL (G16 ENGINE)
3) Install oil pump to cylinder block.
As there are 2 types of oil pump bolts, refer to figure for their
correct use and tighten them to specified torque.
Tightening torque
Oil pump bolt
(a) : 11 N·m (1.1 kg-m, 8.0 lb-ft)
1. No. 1 bolts (short)
2. No. 2 bolts (long)
4) Install rubber seal between oil pump and water pump.
5) Install timing pulley key (1) and crank timing belt pulley (2).
Refer to figure for proper installation of these parts.
With crankshaft locked, tighten crank timing belt pulley bolt
(3) to specified torque.
Tightening torque
Crank timing belt pulley bolt
(a) : 130 N·m (13.0 kg-m, 94.0 lb-ft)
Special tool
(A) : 09927-56010
4. Dowel pin (crankshaft pulley pin)
5. Flywheel (Drive plate for A/T)
6) Install timing belt, tensioner, oil pump strainer, oil pan and
other parts referring to "Timing Belt and Belt Tensioner" and
"Oil Pan and Oil Pump Strainer" in this section.
7) Check to ensure that all removed parts are back in place.
Reinstall any necessary parts which have not been rein-
stalled.
8) Adjust water pump drive belt tension referring to "Cooling
Fan Belt Tension Check and Adjustment" in Section 6B.
9) Adjust power steering pump belt tension or A/C compressor
belt tension, if equipped. Refer to "Engine" in Section 0B.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents