Suzuki Engine 2002 GRAND VITARA SQ420 Service Manual page 438

Table of Contents

Advertisement

3) Check timing mark on crankshaft as shown in figure.
1. Crank timing pulley key
2. Oil jet
4) Install RH bank camshafts, referring to "RH (No.2) Bank 2nd
Timing Chain and Chain Tensioner" in this section for instal-
lation.
5) Install LH bank camshafts.
Apply oil to sliding surface of each camshaft and camshaft
journal then install them by aligning match marks (4) on cyl-
inder head (3) and LH bank camshafts as shown in figure.
[A] : LH bank
1. LH bank intake camshaft
2. LH bank exhaust camshaft
6) Install LH bank camshaft housing pins as shown in figure.
7) Apply sealant "A" to LH bank exhaust camshaft housing No.5
sealing surface area as shown in figure.
"A" : Sealant 99000-31250
1. LH bank intake camshaft
2. LH bank exhaust camshaft
3. Pin installation position
4. Area to apply sealant "A"
8) Check position of LH bank camshaft housings.
Embossed marks are provided on each camshaft housing,
indicating position and direction for installation. Install hous-
ings as indicated by these marks.
1. I : Intake side, E : Exhaust side
2. Position from timing chain side
3. Timing chain side
ENGINE MECHANICAL (H25 ENGINE) 6A2-63

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents