Unit Repair Overhaul; Engine Assembly - Suzuki Engine 2002 GRAND VITARA SQ420 Service Manual

Table of Contents

Advertisement

6A2-92 ENGINE MECHANICAL (H25 ENGINE)

Unit Repair Overhaul

Engine Assembly

REMOVAL
1) Release fuel pressure in fuel feed line.
Refer to "Fuel Pressure Relief Procedure" in Section 6-1.
2) Disconnect negative cable at battery.
3) Remove engine hood.
4) Drain engine oil.
5) Drain coolant.
6) Remove radiator, radiator fan shroud, cooling fan and radia-
tor reservoir. Refer to "Cooling Fan and Fan Clutch" and
"Radiator" in Section 6B for removal.
7) Disconnect accelerator cable (1) and A/T throttle cable (for
A/T vehicle) (2) from throttle body.
8) Detach fuse/relay box, then remove strut tower bar and
surge tank cover.
9) Disconnect IAT sensor coupler then remove air cleaner
upper case, intake air hose, intake air pipe and surge tank
pipe as a component.
10) Remove engine oil level gauge guide and A/T fluid level
gauge guide (for A/T vehicle).
11) Remove ignition coil covers.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents