3.0

Scope

Operation describes EX 5/7/11RT system characteristics of indicators and controls, modes and specifications and
theory of operating the EX 5/7/11RT. The user procedures include performing software programming that will
maintain smooth performance. Refer to Figure 1.6 for descriptions of circled numbers.
3.1

Initial Startup

1. Check that the manual bypass switch
2. Set the normal AC source circuit breaker
3. Set the battery circuit breaker
The load is powered via the bypass AC source, but not protected by the UPS.
Batteries are recharging, an eight-hour recharge period is necessary to get full backup time.
17
LED
is ON.
Figure 3-1: Initial Startup Display.
86-86000-00 A01
7
is on Normal position.
8
14
to the ON position.
17
OFF
ON
to the ON position.

Operation

Operation
3 — 1

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EX 11RT and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Ex 5rtEx 7rt

Table of Contents