C: I/O Box Terminal Block Diagram; B: Step 3; Typical Straight Metal Conduit Installation - MGE UPS Systems EX 11RT Installation And User Manual

Mge ups systems, inc. user manual power supply ex 5rt / ex 7rt/ ex 11rt
Hide thumbs Also See for EX 11RT:
Table of Contents

Advertisement

EX 5/7/11 RT System
Figure 2-12b: Step 3; Typical Straight Metal Conduit installation.
5.
Typical Straight Conduit Installation
OFF
O
(a)
NOTE: Place lug ring inside
the terminal block cover.
Screw coupling into lug ring.
Figure 2-12c: I/O Box Terminal Block Diagram.
Output
200/208/220/230/240Vac
L6
L5
2 — 14
OFF
O
(d)
Normal AC Source
200/208/220/230/240Vac
L2
L1
L1
Installation
5.
Typical straight metal conduit
Installation.
a) Secure strain relief onto the
(c)
(e)
b) Insert three wire through flexible
(b)
c) Strip the insulation of each wire
CAUTION:
d) Secure three wires into the terminal
e) Twist the conduit onto the coupling
Bypass AC Source
200/208/220/230/240Vac
L4
L3
Jumper
terminal block cover as shown.
conduit.
back 1/2" to expose solid wire.
Always connect the
earth ground wire first.
block using guide printed on bottom
of I/O box.
body as shown.
86-86000-00 A01

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EX 11RT and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Ex 5rtEx 7rt

Table of Contents