IBM System x3550 M5 Type 5463 Installation And Service Manual page 215

Table of Contents

Advertisement

Statement 8
CAUTION:
Never remove the cover on a power supply or any part that has the following
label attached.
Hazardous voltage, current, and energy levels are present inside any component
that has this label attached. There are no serviceable parts inside these
components. If you suspect a problem with one of these parts, contact a service
technician.
To install a hot-swap ac power supply, complete the following steps:
Procedure
1. Read the safety information that begins on "Safety" on page vii and
"Installation guidelines" on page 122.
2. Touch the static-protective package that contains the hot-swap power supply
to any unpainted metal surface on the server; then, remove the power supply
from the package and place it on a static-protective surface.
3. If you are installing a hot-swap power supply into an empty bay, remove the
power-supply filler from the power-supply bay.
Figure 115. Power supply installation
Chapter 5. Removing and replacing components
199

Advertisement

Table of Contents
loading

Table of Contents