2. Periodical check
[2]
[3]
[2]
10. Repeat steps 1 to 9 similarly for the 4th drawer.
10
[1]
[2]
A093F2C532DA
[1]
A093F2C533DA
Field Service Ver. 2.0 Jan. 2008
8. Remove two C-rings [1], two bush-
ings [2], and remove the pick-up
roller assy [3].
9. Remove the C-ring [1] and remove
the pick-up roller [2].