Ricoh D025 Service Manual page 79

Table of Contents

Advertisement

6.
Insert the joint pins [A].
7.
Attach the front [B] and rear brackets [C].
8.
Pull out the front and rear rails [A], and then hang them on each bracket [B].
9.
Connect the LCT cable [C] to the main machine.
10. Slide the LCT [D] into the main machine.
11. Make sure that the front and rear sides of the LCT are closely attached to the main
machine.
SM
1200-Sheet LCT (D353)
2-31
D023/D025

Advertisement

Table of Contents
loading

This manual is also suitable for:

D023

Table of Contents