5.
Install the 500-sheet finisher [A].
6.
Install the holder bracket [B] (
7.
Connect the finisher cable [C].
8.
Install the shift tray [A] (
9.
Turn on the main power switch and check the finisher operation.
D023/D025
x 1; M3 x 6).
x 2 - M3 x 8).
2-54
SM