Omron CJ - 09-2009 Operation Manual page 43

Programmable controllers
Table of Contents

Advertisement

Application Precautions
• Install external breakers and take other safety measures against short-cir-
cuiting in external wiring. Insufficient safety measures against short-cir-
cuiting may result in burning.
• Install Units as far as possible away from devices that generate strong,
high-frequency noise.
• Do not apply voltages to the Input Units in excess of the rated input volt-
age. Excess voltages may result in burning.
• Do not apply voltages or connect loads to the Output Units in excess of
the maximum switching capacity. Excess voltage or loads may result in
burning.
• Separate the line ground terminal (LG) from the functional ground termi-
nal (GR) on the Power Supply Unit before performing withstand voltage
tests or insulation resistance tests. Not doing so may result in burning.
• Change the applied voltage gradually using the adjuster on the Tester. If
full dielectric strength voltage is applied or turned OFF using the switch on
the Tester, the generated impulse voltage may damage the Power Supply
Unit.
• Install the Units properly as specified in the operation manuals. Improper
installation of the Units may result in malfunction.
• Do not apply a force greater than 100 N on the terminal block when tight-
ening the terminals.
• Do not drop the product or subject it to excessive vibration or shock.
• Be sure that all the terminal screws, and cable connector screws are tight-
ened to the torque specified in the relevant manuals. Incorrect tightening
torque may result in malfunction.
• Leave the label attached to the Unit when wiring. Removing the label may
result in malfunction if foreign matter enters the Unit.
• Remove the label after the completion of wiring to ensure proper heat dis-
sipation. Leaving the label attached may result in malfunction.
• Use crimp terminals for wiring. Do not connect bare stranded wires
directly to terminals. Connection of bare stranded wires may result in
burning.
• Wire all connections correctly.
• Double-check all wiring and switch settings before turning ON the power
supply. Incorrect wiring may result in burning.
• Mount Units only after checking terminal blocks and connectors com-
pletely.
• Be sure that the terminal blocks, Memory Units, expansion cables, and
other items with locking devices are properly locked into place. Improper
locking may result in malfunction.
• Check switch settings, the contents of the DM Area, and other prepara-
tions before starting operation. Starting operation without the proper set-
tings or data may result in an unexpected operation.
• Check the user program for proper execution before actually running it on
the Unit. Not checking the program may result in an unexpected opera-
tion.
• Confirm that no adverse effect will occur in the system before attempting
any of the following. Not doing so may result in an unexpected operation.
• Changing the operating mode of the PLC (including the setting of the
startup operating mode).
5
xliii

Advertisement

Table of Contents
loading

Table of Contents