Omron CJ - 09-2009 Operation Manual page 279

Programmable controllers
Table of Contents

Advertisement

Installation
Wiring Ducts
• Whenever possible, route I/O wiring through wiring ducts or raceways.
Install the duct so that it is easy to fish wire from the I/O Units through the
duct. It is handy to have the duct at the same height as the Racks.
The following example shows the proper installation of wiring duct.
30 mm
Note Tighten terminal block screws and cable screws to the following torques.
Terminal Screws
M3.5:
0.8 N·m
M3:
0.5 N·m
Cable Connector Screws
M2.6:
0.2 N·m
Duct
20 mm min.
DIN Track
Unit
20 mm min.
Duct
30 mm
40 mm
Duct
Section 5-2
81.6 to 89 mm
CPU
Rack
Mounting
bracket
Expansion
Rack
231

Advertisement

Table of Contents
loading

Table of Contents