Appendix B Troubleshooting - ADTRAN ATLAS 800 PLUS User Manual

Hide thumbs Also See for ATLAS 800 PLUS:
  • Q&a (22 pages)
Table of Contents

Advertisement

Appendix B
61200226L1-1
Troubleshooting
Power-up Self Test Fails
Modules seated improperly, module failure
Remove all modules and cycle power to the unit. If self test still fails, call
Technical Support and report the results. If the self test now passes, re-in-
sert modules one at a time, running the self test after installing each mod-
ule. When an installed module causes the self test to fail, note it and report
results to tech support.
System Timing Source Unlocked
(Displayed on Terminal Interface, "System Status")
Selected Timing Source is not present or clock is out of toler-
ance
Verify that system timing is correctly configured for the desired clock.
Verify that the interface cable to clock source is present.
Temporarily configure the system to operate off of internal timing. Ver-
ify that the system can lock to this clock.
PLUS
ATLAS 800
User Manual
B-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

1200226l11200228l1

Table of Contents