Test; Last Run Time; Next Run Time; Last Test Status - ADTRAN ATLAS 800 PLUS User Manual

Hide thumbs Also See for ATLAS 800 PLUS:
  • Q&a (22 pages)
Table of Contents

Advertisement

TEST

>
» Last Run Time
» Next Run Time
» Last Test Status
» Pass : Fail
» Test Now
61200226L1-1
This only displays if an endpoint is configured for Originate. This submenu
is used to monitor regular test call status for the backup endpoint. The
record label displays the number of successful tests and the number of test
failures, respectively.
Only displays if a test call has been attempted. This displays the date of the
last attempted test call.
Only displays if a test call is scheduled. This displays the date of the next
test call attempt.
Displays the status of the most recent test call.
Idle
No test call has been attempted.
Running
A test call is currently running.
Failed
The most recent test call failed.
Passed
The most recent test call passed.
Displays the number of successful tests and the number of test failures, re-
spectively.
Use this activator to manually initiate a test call.
PLUS
ATLAS 800
Chapter 9. Dedicated Circuit Backup and Circuit Status
User Manual
9-7

Advertisement

Table of Contents
loading

This manual is also suitable for:

1200226l11200228l1

Table of Contents