Inspections before Trial Run
1) Inspecting the wiring
• Make sure that all wire connections (especially main power and motor output ) are correct.
• Make sure that there is no short, and earth wires are properly connected.
• Make sure that there is no poor connections.
Operation with CN I/F Connected
1) Connect CN I/F.
2) Connect the control signal (COM+/-) to the power supply (12 to 24V DC).
- 59 -