Mitsubishi MELSEC-Q Series User Manual page 169

Cc-link system master/local module, mitsubishi programmable logic controller
Hide thumbs Also See for MELSEC-Q Series:
Table of Contents

Advertisement

7 PROCEDURE BEFORE STARTING THE DATA LINK
7 - 17
(2) Checking the status of communication with a specific remote station/local
station/intelligent device station/standby master station (line test 2)
Line test 2 checks whether data linking can be performed normally with a specific
remote station, local station, intelligent device station or standby master station.
Execute line test 2 according to the following procedure.
Check items prior to executing line test 2:
Verify that the CPU RUN/STOP switch is set
to "STOP."
Verify that the CPU RESET switch is set to
the "Middle position".
Set the master module "station number setting
switch" to the station number of the module for
which the test is to be performed.
Set the "transmission rate/mode setting
switch" for the master module to "5 to 9 (the
transmission rate should be the same as when
the system is operating)".
Operate the CPU RESET switch according to
the following procedure.
1) Set the RESET switch to RESET.
RESET
2) Set the RESET switch to the middle position.
RESET
Start
L.CLR
L.CLR
To the next page
MELSEC-Q
7 - 17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qj61bt11

Table of Contents