Mitsubishi MELSEC-Q Series User Manual page 154

Cc-link system master/local module, mitsubishi programmable logic controller
Hide thumbs Also See for MELSEC-Q Series:
Table of Contents

Advertisement

7 PROCEDURE BEFORE STARTING THE DATA LINK
From the previous page
Register the parameters to the PLC CPU
Set the PLC CPU RESET switch from "RESET" to
"Middle position" or turn the power from OFF to ON
7 - 2
Register PLC parameter/program to the PLC CPU
Set the PLC CPU RESET switch from "RESET" to
"Middle position" or turn the power from OFF to ON
Turn the RUN/STOP switch of the PLC CPU
to "RUN"
Check operation using the LED display
(master station):
When data link is normal: L RUN LED is lit
When the data link is faulty: L ERR LED is lit
Check the connection status of each module
(line test). (see Section 7.8)
Check operation using the CC-Link diagnosis.
(see Section 13.4)
Register the control program in the PLC CPU
Set the PLC CPU RESET switch from "RESET" to
"Middle position" or turn the power from OFF to ON
System operation
End
MELSEC-Q
From the previous page
7
7 - 2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qj61bt11

Table of Contents