Ida Start-Up - Nortel Communication Server 1000 Manual

Dass2 fundamentals
Hide thumbs Also See for Communication Server 1000:
Table of Contents

Advertisement

Table 92
IDA status check (cont'd.)
Step
Action
6
Check to assure the following IDA cables
are connected correctly:
PRI to DCHI cable
2Mb/s transmission cable from
NT8D72BA to DSX (the digital cross
connect)

IDA start-up

Table 93 "DASS2 start-up" (page 173)
the PRI and DCHI from a disabled to an operational state.
Table 93
DASS2 start-up
Step
Action
1
Check the status of PRI cards.
2
Enable PRI using:
LD 75
ENL DDCS l(loop)
Nortel Communication Server 1000
DASS2 Fundamentals
NN43001-571 04.01 4 June 2010
Copyright © 2007-2010 Nortel Networks. All Rights Reserved.
Response
32 UNEQ
30 DSBL
provides the steps required to take
Response
The PRI shown is disabled.
ENBL
IDA start-up 173

Advertisement

Table of Contents
loading

Table of Contents