172 IDA status check and start-up

IDA status check

This status check outlined in
used to verify that an IDA link is working normally. It assumes the PRI and
DCHI are properly installed (for example, correctly cabled) and operational.
If the IDA status is not as shown in the steps below, complete the check
and proceed to IDA fault clearing procedures.
Once all problems are cleared, go to IDA start-up.
Table 92
IDA status check
Action
Step
1
Check the status LEDs on PRI cards.
2
Note whether any other LED is lit and
continue with the status check.
3
Check the LED on the DCHI faceplate.
4
Check the status of all DCHI ports using:
LD 75
STAT DDSL
5
Check the status of PRIs using:
LD 75
STAT DDCS
STAT DDCS n
Nortel Communication Server 1000
DASS2 Fundamentals
NN43001-571 04.01 4 June 2010
Copyright © 2007-2010 Nortel Networks. All Rights Reserved.
Table 92 "IDA status check" (page 172)
Response
For normal operation, only the green ACT
LED is lit.
If the LED is lit, the D-channel is disabled.
The DCHI status should be ENBL ACTIVE
(DCHI enabled, and all configured
channels are normally enabled).
Sample response:
DDCS 003 ENBL
DDCS 004 ENBL
is