Port Sequential - Planet GS-5220 Series User Manual

L2+ gigabit/10 managed lcd switch
Hide thumbs Also See for GS-5220 Series:
Table of Contents

Advertisement

4.16.4 Port Sequential

This page allows the user to configure the PoE Ports started up interval time
Figure 4-16-3
shows.
Figure 4-16-3: PoE Port Sequential Power Up Interval Configuration Screenshot
The PoE port will start up after the whole system program has finished running.
The page includes the following fields:
Object
• Sequential Power up
Option
• Sequential Power up
Interval
• Sequential Power up
Port Option
Description
Allows user to enable or disable Sequential Power up function.
Allows user to configure the PoE Port Start Up interval time.
There are two modes for Starting Up the PoE Port
By Port: The PoE Port will start up by following Port number.
By Priority: The PoE Port will start up by following the PoE Priority.
499
User's Manual of GS-5220 LCD Series
. The PoE Port will start up one by one as

Advertisement

Table of Contents
loading

Table of Contents