Cable Diagnostics - Planet GS-5220 Series User Manual

L2+ gigabit/10 managed lcd switch
Hide thumbs Also See for GS-5220 Series:
Table of Contents

Advertisement

Buttons
: Click to apply changes
:
Click to undo any changes made locally and revert to previously saved values.
: Clears the IP Address and the result of ping value.

4.15.4 Cable Diagnostics

This page is used for running the Cable Diagnostics.
Press to run the diagnostics. This will take approximately 5 seconds. If all ports are selected, this can take
approximately 15 seconds. When completed, the page refreshes automatically, and you can view the cable
diagnostics results in the cable status table. Note that Cable Diagnostics is only accurate for cables of length 7 -
140 meters.
10 and 100 Mbps ports will be linked down while running cable diagnostic. Therefore, running cable diagnostic
on a 10 or 100 Mbps management port will cause the switch to stop responding until VeriPHY is complete. The
VeriPHY Cable Diagnostics screen in
Figure 4-15-4
appears.
489
User's Manual of GS-5220 LCD Series

Advertisement

Table of Contents
loading

Table of Contents