Task 20: Run Test Switch-Link Long - Lucent Technologies DEFINITY AUDIX Installation And Upgrade

Release 3.2.4
Hide thumbs Also See for DEFINITY AUDIX:
Table of Contents

Advertisement

Task 20: Run Test Switch-Link Long

9. Press the
the screen.
10. From any telephone, dial the priority calling access code that you wrote
down in Step 4.
11. When you hear the second dial tone, enter the extension of the first
DEFINITY AUDIX voice port listed on Worksheet B-1, Administering Voice
Ports as Stations.
If the DEFINITY AUDIX system answers, proceed to Step 12. Otherwise,
refer to the troubleshooting procedures in DEFINITY AUDIX
System —Maintenance , 585-300-110.
12. Repeat Steps 10 and 11 for the remaining extensions on the worksheet.
13. When all DEFINITY AUDIX voice ports have answered, return to the
DEFINITY AUDIX system terminal. Type release voice-group and press
RETURN
The system responds with the Release Voice-Group screen.
14. Press the
screen.
15. Proceed to the next task.
Task 20: Run Test Switch-Link Long
This task is required only if the DEFINITY AUDIX system is using CL integration.
1. Type busyout voice-group at the command line and press
2. Press
3. With the cursor on the DEFINITY AUDIX command line, type test switch
link long and press
(F3) function key to busy out the voice groups and exit
ENTER
.
(F3) function key to release the voice group and exit the
ENTER
(F3) to execute the command.
ENTER
.
RETURN
RETURN
Issue 2 December 1996
4-7

Advertisement

Table of Contents
loading

Table of Contents