Part I: Physical And Power Installation - Alcatel-Lucent 1850 Installation And System Turn-Up Manual

Transport service switch (tss-5) | release 5.1
Hide thumbs Also See for 1850:
Table of Contents

Advertisement

Physical and power installation
............................................................................................................................................................................................................................................................
Quantity
1
1
1
1
1
1
1
1
1
1
1
............................................................................................................................................................................................................................................................
I- 2
Description
Heat Baffle
(848862181) with
19"
or 23" brackets
Screwdriver(s)
RJ-45 Crimping tool
Wire-wrap gun
R-4496A
ESD wrist strap
R-4987C
Torque wrench
(R-5952)
Torque screwdriver
Mini BNC
install/remove tool
Metric & inch series
tool set - R-6001
Multimeter (optional)
ITE-6379C
Ohmmeter ITE-6379C
DS1 error rate test set
ITE-7113
Comments
The Alcatel-Lucent 1850 TSS-5 can be stacked on top
of each other without using a heat baffle due to its
integrated fan unit. Only use a heat baffle above or
below the shelf if other equipment generates heat
towards the Alcatel-Lucent 1850 TSS-5 shelf.
A screwdriver(s) with the appropriate head(s) is (are)
required for securing the mounting screws,
repositioning the mounting brackets, and installing the
interfacing cables.
The crimping tool is required for terminating DS1/E1
blunt-cut cables to a RJ-45 connector.
The wire-wrap gun is required for terminating DS1/E1
cable and must be able to accommodate 26-gauge wire.
A wrist strap must be worn when handling circuit
packs. Use the electrostatic discharge (ESD) jack
provided on the shelf.
A torque wrench (50-250 IN-LBS) is used when
Alcatel-Lucent 1850 TSS-5
tightening the
the frame. It is also used when reattaching the
mounting brackets to the
shelf.
A torque screwdriver is used to attach the -48or
+24Volt wiring to the terminal block.
A tool for removing or connecting mini bnc connectors
to the VLIU panel. Comcode 409079993 (Pt. No. RT-
4L Trompeter)
Because some optical networking products (also know
as transport) may have some metric fasteners, please
ensure that the proper metric tools are available.
The voltmeter must be capable of measuring DC
voltage in the 0 to 80 volt range. The use of the
voltmeter is optional since the shelf will alarm or shut
down if the proper voltage is not supplied.
An ohmmeter is required to verify that the
is properly grounded.
Lucent 1850 TSS-5
A DS1 error rate test set is required for testing of DS1
cabling. A T-BERD 209 or equivalent is recommended.
shelf to
Alcatel-Lucent 1850 TSS-5
Alcatel-
365-372-403R5.1
Issue 1 November 2008

Advertisement

Table of Contents
loading

Table of Contents