Automatic Protection Switching Test - Alcatel-Lucent 1850 Installation And System Turn-Up Manual

Transport service switch (tss-5) | release 5.1
Hide thumbs Also See for 1850:
Table of Contents

Advertisement

Connecting adjacent network elements
............................................................................................................................................................................................................................................................

Automatic protection switching test

Description
This section provides the procedures for verifying the Alcatel-Lucent 1850 TSS-5 shelf
automatic and manual protection switching.
Note the following:
These tests do NOT simulate circuit pack failures.
A properly grounded wrist strap must always be worn while handling circuit packs.
Prior to performing each test, the shelf under test must be clear of all alarms (that is,
only green LEDs are lighted).
MAIN1 VLNC50/52 switch test
Proceed as follows:
........................................................................................................................................................................................................................
1
There must be cross-connects present to complete this test. Enter VT1.5 cross-connects
using the cross-connect wizard. At the system level view, Configuration ->
Cross-Connection. Then follow the wizard to establish cross-connections to the DS1
ports. See
........................................................................................................................................................................................................................
2
At the NE system level view, View -> Protection and open by clicking the + sign until you
see the path pertaining to the cross connection that was established above and enter select
at the bottom of the screen.
Result:
Note:
active path.
........................................................................................................................................................................................................................
Disconnect the optical fiber connected to the IN of the port that is the active receiver on the
3
VLNC50 circuit pack.
Result:
FAULT LED will flash on the OLIU.
........................................................................................................................................................................................................................
4
At the NE system level view, View -> Protection and open the menu until you see the path
pertaining to the cross connection that was established above.
............................................................................................................................................................................................................................................................
7 - 8
"DS1 testing procedure" (p. 6-10)
Path state information will be given including which path is in the active state.
M1-1 is associated with Ring 1 and M1-2 is associated with Ring 2. Note the
The NE and then MN/ABN alarm LED will light on the SYSCTL and the
Automatic protection switching test
for details.
365-372-403R5.1
Issue 1 November 2008