Stand-alone installation testing
............................................................................................................................................................................................................................................................
........................................................................................................................................................................................................................
21
Select Finish from the bottom of screen.
Result:
Requirement:
If an error-free signal is still not received:
Verify the cross-connect under View- > Cross connections and select the port.
Verify that the correct framing format is being sent either Cycle Redundancy Check-4
or Frame Alignment Signal; CRC-4 is the default.
Verify the port monitoring mode is IS (In Service).
Check E1 cabling for proper connections.
To change provisioning port information, right click on the E1 port and select
Configure port.
........................................................................................................................................................................................................................
22
Repeat
E
O
N D
........................................................................................................................................................
DS1/E1 facility loopback testing
Facility loopback testing allows the installer to verify the electrical cabling to the Alcatel-
Lucent 1850 TSS-5 shelf. When the shelf is cabled to other DS1/E1 terminating
equipment, it will be necessary to contact the Customer Network Control Center and have
a signal established at the port under test, in order to complete the loopback testing.
........................................................................................................................................................................................................................
1
With the DS1/E1 test set still connected to the port under test, establish a loopback. Under
the NE system view, select Fault -> Loopback.
........................................................................................................................................................................................................................
2
Select the "+" sign next to GRP grp-a-1 (8/28 DS1 or 8/21 E1).
........................................................................................................................................................................................................................
3
Select the VT group under test (VT Group 1,VT Group 2, VT Group 3, or VT Group 4).
Note:
........................................................................................................................................................................................................................
4
Select the DS1/E1 port.
............................................................................................................................................................................................................................................................
365-372-403R5.1
Issue 1 November 2008
A cross-connection is established from m1-1-1-1 to a-1-1.
The E1 test set will indicate it is receiving an error-free QRSS signal.
Step 2
to
Step 21
above for all other E1 ports associated with the VLNC50/52.
S
F
T E P S
For E1, select the TUG-2 -2, TUG-2-2, ... TUG-2-7.
Local equipment and cross-connect tests
6 - 1 5