Part I: Physical and power
installation
Overview
Purpose
Part I of this document covers the physical installation of the Alcatel-Lucent 1850
Transport Service Switch 5 (Alcatel-Lucent 1850 TSS-5) rack mount shelf; the running
and terminating of power cables, miscellaneous cables, and fibers. The installation and
downloading of circuit packs.
Contents
This part of the document contains the following chapters:
Physical installation
Cable and fiber installation
Circuit pack installation
Tools, test equipment, and accessories
This section lists the tools, test equipment and accessories needed to perform all the
procedures in this installation manual.
Listed below are the required tools, test equipment and accessories.
Quantity
1 set
............................................................................................................................................................................................................................................................
365-372-403R5.1
Issue 1 November 2008
Description
rack-
Brackets for
mount
Alcatel-Lucent
1850 TSS-5
Comments
The Alcatel-Lucent 1850 TSS-5 shelf mounts in a 19"
or 23" wide bay, adjustable brackets are included. For
standard 23" bays, see ED8C500-50, ED8C501-50,
ED8C502-50, ED8C504-50 and ED8C509-50
For seismic 23" bays, see ED8C800-50, ED8C800-70,
ED8C808-50 and 847138351 (ED8C801-50,51).