Connecting adjacent network elements
............................................................................................................................................................................................................................................................
........................................................................................................................................................................................................................
7
At the NE system level view, establish a protection switch with Fault -> Protection, click
the + sign to open up to the path level switch type = manual then choose the Apply
button at the bottom of the screen.
........................................................................................................................................................................................................................
8
View the protection to determine that the switch was established and now the path that was
originally active is active again.
Result:
switch being issued.
........................................................................................................................................................................................................................
9
At the NE system level view, establish a protection switch with Fault -> Protection, click
the + sign to open up to the path level switch type = clear then choose the Apply button at
the bottom of the screen.
........................................................................................................................................................................................................................
10
View the protection to determine that the switch has cleared.
........................................................................................................................................................................................................................
11
Repeat
........................................................................................................................................................................................................................
12
Delete any VT1.5 /VC12 or STS-1 cross-connections under Configuration ->
Cross-Connection -> Delete Cross-Connections.
........................................................................................................................................................................................................................
13
Check off the appropriate box in
E
O
N D
........................................................................................................................................................
............................................................................................................................................................................................................................................................
365-372-403R5.1
Issue 1 November 2008
The active path should now be different from what it was prior to the manual
Step 4
through
Step 10
S
F
T E P S
for every circuit.
Table III-1, "Part III installation checklist" (p.
Manual switching tests
III-1).
7 - 1 1