28. Remove all connectors and FFC from
the operation panel PWB 1.
29. Detach four screws and remove the
operation panel PWB 1.
30. Check or replace the operation panel
PWB 1 and reattach the removed parts
in the original position.
Screw
Figure 1-5-131
1-5-76
Screw
Operation panel PWB 1
Screw
Screw
2RG/2RH