GE Dash 3000 Service Manual page 186

Patient monitor
Hide thumbs Also See for Dash 3000:
Table of Contents

Advertisement

Recommended Calibration, Electrical Safety Tests, and Checkout Procedures
Replacement or
Calibration
Upgrade
Tests
Procedure
NBP assembly
"NBP
Calibration" on
page
7-4.
RF LAN
None
Power supply
None
assembly
Processor/
ECG and BP
Power
on 7-7.
Management
"NBP
Calibration" on
page
7-4.
Writer
None
(Recorder)
8-6
Field Replaceable Units and Upgrades: Disassembly Guidelines
Checkout Procedures
"Noninvasive Blood Pressure Tests" on
page
4-50.
"Monitor Power-up Tests" on page 4-
35.
"Network Test" on page
"RF LAN Test (option)" on page
"Monitor Power-up Tests" on page 4-
35.
"For instructions on verifying
sidestream end-tidal CO2 and setting
the sample line to zero, refer to the
CO2 module operator instructions." on
page
4-54.
"Monitor Power-up Tests" on page 4-
35.
"Analog Output and Defibrillator
Synchronization Tests" on page
"For instructions on verifying
sidestream end-tidal CO2 and setting
the sample line to zero, refer to the
CO2 module operator instructions." on
page
4-54.
"Graph Test" on page
"Graph Speed Test" on page
"Display Test" on page
"Speaker Test" on page
"Network Test" on page
"RF LAN Test (option)" on page
"RAC 2A Module Housing Peripheral
Device Test" on page
"Monitor Power-up Tests" on page 4-
35.
"Graph Test" on page
"Graph Speed Test" on page
Dash 3000/4000 Patient Monitor
2000966-339
Electrical Safety Tests
"Ground (Earth) Integrity" on page
"Ground (Earth) Wire Leakage Current Tests"
on page
"Enclosure Leakage Current Test" on page 4-
29.
"Patient (Source) Leakage Current Test" on
4-57.
page
4-30.
4-57.
"Patient (Sink) Leakage Current Test (Mains
Voltage on the Applied Part)" on page
4-52.
4-55.
4-56.
4-56.
4-56.
4-57.
4-57.
4-58.
4-55.
4-56.
4-26.
4-28.
4-31.
Revision A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dash 4000

Table of Contents