B con-
Signal name
tact
SPINDLE SYNCHRONOUS
CONTROL
—
PHASE ERROR 2 (degree)
(excluding phase shift calc.)
[Function]
This signal informs the phase error (value excluding the phase error memorized with the spindle
synchronization phase shift calculation function) when the phase synchronization (with R
command) or the "Phase shift calculation request" signal (Y435) is ON. The phase error is output by
1 ° increment.
The data has no meaning in cases other than above.
[Operation]
When the phase synchronization (with R command) or the "Phase shift calculation request" signal
(Y435) is ON, and when the speeds of the basic spindle and the synchronous spindle are constant,
the phase error between the basic spindle and the synchronous spindle is output.
B con-
Signal name
tact
—
CLOCK DATA
[Function]
The year, month, date, hour, minute and second data is informed by the controller to the PLC as the
current clock information.
[Operation]
The date and time data is output as shown below. The data is output as binary data.
F
R50
Month
R51
R52
Second
(Example) For October 26, 2002, 14:56:36.
R50 ... 0 0 0 0 1 0 1 0 0 0 0 0 0 0 1 0 = 0A02H
R51 ... 0 0 0 0 1 1 1 0 0 0 0 1 1 0 1 0 = 0E1AH
R52 ... 0 0 1 0 0 1 0 0 0 0 1 1 1 0 0 0 = 1438H
(Note 1) The time is displayed with the 24-hour system.
(Note 2) The data and time are set with the [TIME] screen on the setting and display unit.
6. EXPLANATION OF INTERFACE SIGNALS
6.2 PLC Input Signals (Data Type: R***)
Signal
abbreviation
Signal
abbreviation
87
0
Year
Hour
Date
Minute
October
14 hundred hours 26th day
36 seconds
56 minutes
1st system
R49
1st system
R50~52
2002
6-2-13
2nd system
3rd system
—
—
2nd system
3rd system
—
—