4-5
Installation - Power Stack
AC
LINE FED POWER STACK WIRING CONNECTIONS
Feed the incoming three phase supply cables through the bottom gland plate and connect onto terminals L1, L2 & L3 respectively. Phase rotation
is not critical.
Likewise, feed the three phase motor cables through the bottom gland plate and connect onto terminals U, V & W. Phase rotation is important to
ensure consistency between the inverter motor control direction and motor shaft rotation.
Connect both the incoming supply earth and motor earth to the inverter PE terminals.
710 Stack Bottom Terminals – Frames K – N
Refer to page 4-9 for terminal block wire ranges and page 4-11 for correct terminal torque guidelines.
Refer to 'Chapter 6 – Associated Equipment' for recommended system components for use with the inverter.
AC30 series Variable Speed Inverter