Chapter 2
2-2
Initial Inspection
On receipt, inspect the shipping container for damage. If shipping container
or cushioning material is damaged, it should be kept until the contents of
the shipment have been checked for completeness and the system has been
checked both mechanically and electrically. If the contents are incomplete,
if there is evidence of mechanical damage or defects, or if the system indi-
cates a failure in some component during the initial testing procedure,
please notify MGD Technologies Inc. as soon as possible. If the shipping
container is damaged, or the cushioning material shows signs of stress, no-
tify the carrier as well as MGD Technologies Inc. Keep the shipping mate-
rials for the carrier's inspection.
2-3
System Interconnection
Use Figure 2-12 to connect the ADFM cables and the computer.
Laptop Computer
(Optional - for Testing Only)
Figure 2-1.
page 2-2
Serial Cable
(Optional - for
Testing Only)
ADFM System Interconnection
Internal Batteries
MGD Technologies, Inc.