Equipment Setup And Installation; Introduction - Teledyne ADFM Pro20 Technical Manual

Acoustic doppler flow meter
Hide thumbs Also See for ADFM Pro20:
Table of Contents

Advertisement

Equipment Setup and Installation

2-1

Introduction

This section of the manual contains information and instructions for inspec-
tion, configuration, testing, installation, and deployment of the ADFM Ve-
locity Profiler™. Included in this section are:
• Initial inspection procedures
• Connecting the ADFM components
• Power supply options
• Built-in tests (BITs)
• Final preparations for use
• Installing and deployment
• Packing and shipping information
The general sequence of events in installing and deployment of an ADFM
are:
• Prepare portable computer to be taken to installation site.
• Perform pre-installation equipment and operational checks.
• Connect the ADFM Transducer and Electronics Unit via the
• Measure channel dimensions and determine geometry.
• Setup ADFM configuration file for each installation site.
• Install the ADFM transducer and electronics unit, conduct final
• Program desired data logging parameters into the ADFM.
• Connect phone line to ADFM Modem port, if required.
ADFM Technical Manual (January 2000)
Transducer Cable.
testing.
Equipment Setup and Installation
2
Chapter
page 2-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Adfm analog output moduleAdfm hot tap

Table of Contents