5.9

Series commissioning

Series commissioning is the process where you transfer the settings of one inverter to a
second inverter.
Procedure
To transfer settings from one inverter to another, proceed as follows:
1. Using STARTER , save your project to your PC or PG.
2. Loading your backed up settings to a second inverter:
3. If you control your inverter via PROFIsafe , then adapt the PROFIsafe address.
4. Perform a reduced acceptance for the safety functions.
You have transferred the settings of the first inverter to a second inverter.
Safety Integrated - SINAMICS G110M, G120, G120C, G120D and SIMATIC ET 200pro FC-2
Function Manual, 04/2014, FW V4.7, A5E34261271B AA
Follow the procedure described in the section: Offline commissioning (Page 153).
For further information, refer to the following sections:
– Basic functions: Configuring PROFIsafe (Page 92)
– Extended functions: Configuring PROFIsafe in the converter (Page 127)
The necessary measures are described in the section: Reduced acceptance test after
component replacement (Page 266).
Commissioning
5.9 Series commissioning
155