MX5, MX10, MX40, and MX80 Routers Clearance Requirements for Airflow and
Hardware Maintenance
Copyright © 2017, Juniper Networks, Inc.

Figure 26: Typical Open-Frame Rack

MX5, MX10, MX40, and MX80 Site Preparation Checklist on page 44
MX5, MX10, MX40, and MX80 Installation Summary on page 50
Installing MX5, MX10, MX40, and MX80 Chassis in the Rack on page 85
When planning the installation site, allow sufficient clearance around the rack (see
Figure 27 on page
48):
For the cooling system to function properly, the airflow around the chassis must be
unrestricted. Allow at least 6 in. (15.2 cm) of clearance between side-cooled routers.
Allow 2.8 in. (7 cm) between the side of the chassis and any non-heat-producing
surface such as a wall.
For service personnel to remove and install hardware components, there must be
adequate space at the front and back of the router. At least 24 in. (61 cm) are required
Chapter 7: Preparation Overview
47