Prepare The Power Cords - Sun Oracle SPARC T3-1 Installation Manual

Hide thumbs Also See for SPARC T3-1:
Table of Contents

Advertisement

FIGURE:
Figure Legend
1
2
3
Related Information
"Connecting the Server Cables" on page 47

▼ Prepare the Power Cords

The service processor runs on the 3.3V standby voltage, which becomes available as
soon as a power source is connected to the server. If you do not want the server to
start the initialization diagnostics at this point, connect only the power supply end of
the power cord(s).
Plug the power cords into the power supplies.
Note – Do not connect the power cords to the power sources at this time. Doing so
will cause you to miss system initialization and diagnostic messages that are output
during the power-up phase.
Related Information
"Connect a Terminal or Emulator to the SER MGT Port" on page 57
52
SPARC T3-1 Server Installation Guide • March 2012
PCIe and PCIe/XAUI Slot Configuration
PCIe slot 0 or XAUI slot 0
PCIe slot 1
PCIe slot 2
4
PCIe slot 3 or XAUI slot 1
5
PCIe slot 4
6
PCIe slot 5

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SPARC T3-1 and is the answer not in the manual?

Table of Contents