Caution – The server weighs approximately 60 lb (25 kg). Two people are required
to lift and mount the server into a rack enclosure when using the procedures in this
chapter.
Caution – Before continuing, verify that the server is securely mounted in the rack,
and that the slide rails are locked to the mounting brackets.
2. If the chassis or rack is equipped with an antitilt bar, deploy it.
3. Slide the chassis into the rack.
Mounting the Chassis on the Slide Rails
FIGURE:
Related Information
"Slide Rail Assembly Overview" on page 23
■
Installing the Server
39
Need help?
Do you have a question about the SPARC T3-1 and is the answer not in the manual?
Questions and answers