2. Verify the operation of the slide rails and CMA, and cable service loops.
Repeate the steps described in the procedure:
Slide Rails and the CMA" on page
Related Information
"Cable Management Overview" on page 53
54
SPARC T3-1 Server Installation Guide • March 2012
Securing the Server Cables With the CMA and Velcro Straps
"Verify Correct Operation of the
44.