Tools Needed for Installation

To install the system, you must have the following tools:
No. 2 Phillips screwdriver
ESD mat and grounding strap
You must also provide a system console device, such as one of the following:
ASCII terminal
Workstation
Terminal server
Patch panel connected to a terminal server
Related Information
"ESD Precautions" on page 20
"Server Handling Precautions" on page 19

Optional Component Installation

Optional conponents that are ordered as part of the server's initial configuration will
be installed in the server before it is shipped. However, if you place a separate order
for optional components, you will need to install them in the server on site. See the
service manual for instructions on installing optional components.
Tip – If possible, install any additional components in the server before you install
the server in its rack or cabinet.
Related Information
"Tools Needed for Installation" on page 21
Preparing for the Installation
21

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SPARC T3-1 and is the answer not in the manual?

Table of Contents