Husqvarna 2013 TC 250R Workshop Manual page 218

Husqvarna motorcycles 2013 te 250r; 2013 te 310r; 2013 te 310r usa; 2013 tc 250r; 2013 tc 250r usa; 2013 txc 250r usa; 2013 txc 310r usa
Table of Contents

Advertisement

TE 250R - 310R 2013 I.E. / TE 310R 2013 I.E. USA
Workshop Manual Ed. 07-2012
FRONT SUSPENSION
TC 250R 2013 - TC 250R 2013 I.E. USA
TXC 250R - 310R 2013 I.E. USA
Check oil level. It should be about 145 mm (5.7 in.).
H06843
Push the piston rod all the way down and install the bottom valve assembly.
With the bottom valve assembly installed, check that the piston rod is fully extended.
H06844
Hold the cartridge octagonal nut to prevent rotation.
Use a similar tool in the octagonal recess of the bottom valve assembly.
Tighten the bottom valve assembly to 29 Nm (21.4 ft/lb) using a wrench.
H06845
Hold the cartridge with the piston rod end pointing downwards as shown in the
figure.
Pump the piston rod up and down a dozen times to help oil reach all points of
the unit.
H06847
I.14

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents