Input Shaft (5 Speed) - Husqvarna 2013 TC 250R Workshop Manual

Husqvarna motorcycles 2013 te 250r; 2013 te 310r; 2013 te 310r usa; 2013 tc 250r; 2013 tc 250r usa; 2013 txc 250r usa; 2013 txc 310r usa
Table of Contents

Advertisement

ENGINE REASSEMBLY
TE 250R - 310R 2013 I.E. / TE 310R 2013 I.E. USA
TC 250R 2013 - TC 250R 2013 I.E. USA
TXC 250R - 310R 2013 I.E. USA

Input shaft (5 SPEED)

Fit roller cage (1) and 5th gear (2) on the bushing and then install the washer
(3) and the retaining ring (4). The washer must be placed between gear and
retaining ring. Fit 3rd gear (5), retaining ring (6) and washer (7).
Fit the roller cage (8).
Fit 4th gear (9).
Fit 2nd gear (10).
Fit the circlip (11).
B: with 5th gear engaged
C: with 4th gear engaged
D: lubricate with MOLYKOTE G-n plus
Workshop Manual Ed. 07-2012
H.17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents