Chapter 5: Powering On The Switch - Allied Telesis AT-x510-28GPX Installation Manual

Allied telesis x510 series gigabit ethernet switches
Hide thumbs Also See for AT-x510-28GPX:
Table of Contents

Advertisement

Chapter 5
Powering On the Switch
This chapter contains the following procedures:
"Powering On the Switch" on page 74
"Powering On the DC Powered AT-x510-28GSX-80 Switch" on
page 77
"Monitoring the Initialization Processes" on page 85
"Configuring the Switch for Stand-alone Operations" on page 89
"Specifying Ports in the Command Line Interface for Stand-alone
Switches" on page 95
73

Advertisement

Table of Contents
loading

Table of Contents