Starting System Removal; Starting System Installation - Isuzu NHR 4J Series Workshop Manual

Table of Contents

Advertisement

ON-VEHICLE SERVICE
REMOVAL
Preparation
1. "50" Terminal
2. "30" Terminal
3. Earth Cable Terminal
4. Starter Assembly
5. Spacer (4JB1, Except cold area)
6D2-3-2.tif
INSTALLATION
5. Spacer (4JB1, Except cold area)
4. Starter Assembly
Starter Bolts and Nuts Torque
3. Earth Cable Terminal
Disconnect Battery Ground Cable.
Tighten the fixing bolt and nut to the specified torque
81 (8.3 / 60)
Connect the earth cable terminal.
STARTING SYSTEM 6D2 – 3
N∙m (Kg∙m/lb∙ft)
6D2-3-1.tif

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nkr 4j series

Table of Contents